|
 |
   
 | Ship Gantry Crane Simulator |  |
 This
module simulates a Ship Gantry Container Crane. This crane is permanently
mounted on a ship with the trolley boom, which runs athwart ship. This
simulation is capable of performing many of the functions performed
in real-life operations.
- Realistic control stand, control panel, and operator's
chair
- 3-axis hydraulic motion base that provides sensation
of movement and motion, jolts from collisions, crane depression
as a heavy load is lifted, bumps from uneven rail gaps, and the many
other jolts and vibrations of normal crane operations
- Instructor's station with display of student view
- Surround sound effects including engine/motor engaging
and disengaging, radio communications with foreman (instructor),
wind, collision, and miscellaneous environmental sounds
- Variable weather conditions including wind (variable
speed, direction, and interval), sunny conditions where sun is fixed
and shadows are cast realistically, and cloudy conditions with no
shadows for depth cueing
- Real-time photo-textured 3-dimensional graphics
- Accurate representations of the working environment
from the operator's field of view
- Variety of cargo configurations
- Accurate weight representation for all cargo loads,
crane capacities, and limits
- Travel of gantry for minor alignment within one hatch
- Variable speed of gantry up to 90 feet (27 meters)
per minute
- Variable hoist speed 0-200 feet (0-60 meters) per
minute
- Variable trolley speed up to 375 feet (112.5 meters)
per minute
- Cross hatch movement of head
- Full range of motion between stops on extended gantry
jibs
- Automatic slow down as gantry approaches limits
- Hoist limit stop 8 feet (2.4 meters) from cable drums
with appropriate deceleration
- Simultaneous hoist and trolley
- Cutoffs at trolley and hoist limits
- Trolley and hoist limit switches
- A forward field of view with approximately 50 degrees
of horizontal view
- Cab rotation, as necessary, for realism and effective
training
- Realistic representations of the operating environment
including landscape, cables, loads, crane structure, boom structural
members and environmental obstacles
- Realistic representations of boom and structural
members
- Realistic blind spots appropriate for representations
of crane structural members
- Load swing as a result of collisions with buildings,
equipment, or other loads
- Main wire swing as a result of load swing
- Avoiding collisions
- Avoiding twisting (helicopter motion)
- Monitoring bologna cable during heavy wind conditions
- Stuck payloads
- Handling rakes chassis
- Unbalanced container loads
- Blocked container locking holes
- Container hung on chassis (vehicle is lifted)
- Container hung on deck
- Twistlock operation failure
- Twistlock indicator failure
- Trolley limit switch failure
- Date
- Start time of simulation
- End time of simulation
- Elapsed time of simulation
- Number and type of loads moved
- Average moves per hour
- Number of major collisions
- Number of minor collisions
- Total number of collisions
Please contact us for more
information about custom crane simulation.
Download information about our crane simulators
|